Compaq MPAC-18 Spezifikationen Seite 9

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 24
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 8
INSTALLATION
2. Installation
2.1. Product Inspection
Carefully unpack the power supply module from the shipping box. If the box or power supply module is damaged, please
notify the freight company to make a damage claim. If you suspect that there is a problem with the power supply module that
may affect it’s safe operation, do not install such a suspect Power Supply into the Active MAXNET II Chassis.
NOTE: This equipment is intended for installation in a RESTRICTED ACCESS LOCATION only.
NOTE: Not for use in a computer room as dened in the Standard for Protection of Electronic Computer/Data Processing
Equipment, ANSI/NFPA 75.
Rack Mounting Precautions
a) Elevated Operating Ambient - If installed in a closed or multi-unit rack assembly, the operating ambient temperature
of the rack environment may be greater than room ambient. Therefore, consideration should be given to installing
the equipment in an environment compatible with the maximum ambient temperature (35ºC) specied by the
manufacturer.
b) Reduced Air Flow - Installation of the equipment in a rack should be such that the amount of airow required for
safe operation of the equipment is not compromised.
c) Mechanical Loading - Mounting of the equipment in the rack should be such that a hazardous condition is not
achieved due to uneven mechanical loading.
d) Circuit Overloading - Consideration should be given to the connection of the equipment to the supply circuit
and the effect that overloading of the circuits might have on overcurrent protection and supply wiring. Appropriate
consideration of equipment nameplate ratings should be used when addressing this concern.
e) Reliable Earthing - Reliable earthing of rack-mounted equipment should be maintained. Particular attention should
be given to supply connections other than direct connections to the branch circuit (e.g. use of power strips).”
2.2. Module Installation Into the Active MAXNET
®
II Chassis
Slide the dual-width MPAC or MPDC power supply module into an open slot in the Active MAXNET II Chassis, one that
spans two single-width module locations beginning with an odd number (indicated by a white marker on the chassis), until the
module drops into its lock position. The module must be inserted into an odd number slot in order for the power supply
module to properly mate to the active chassis back plane. If the power supply is an MPAC unit, connect an appropriate
power cord (depending on the voltage rating used and plug type at installation site) to MPAC’s IEC power inlet. If the power
supply is an MPDC unit, using bus wire, connect –48 VDC into the terminal block on the back of the module following the
terminal block labelling (see below Table 3). A disconnect device is required between the -48 VDC supply and the MPDC
power supply.
To remove a power supply module from the chassis, gently lift the front handle and pull back on the module until it is clear
of the chassis guide slot. Power (AC or DC) should be disconnected from the module before removing for replacement or
service. This is accomplished by removing the AC IEC plug for the MPAC unit and the terminal block for the MPDC unit.
CHAPTER 1: PRODUCT DESCRIPTION CHAPTER 2: INSTALLATION
MAXNET
®
II – MPAC/MPDC Modular Power Supply – Installation & Operation Manual 2-1
Table #3: Rear Terminal Block Assignments
1
2
3
4
5
MPAC-110 /
MPAC-220
MPDC
+24V
OUT
COM
GND
+24V
OUT
COM
GND
RTN
-48V
Seitenansicht 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 23 24

Kommentare zu diesen Handbüchern

Keine Kommentare