Compaq NeoServer 150 Installationsanleitung Seite 10

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 11
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 9
Compaq StorageWorks SAN Switch Power Supply Installation Guide
3
Compaq Confidential – Need to Know Required
Writer: Hilary Stead Project: Compaq StorageWorks SAN Switch Power Supply Installation Guide Comments:
Part Number: EK-P20PS-IA / 161359-001 File Name: EK-P20PS-IA.DOC Last Saved On: 9/30/99 11:27 AM
Installing the Power Supply
To install a new power supply:
1.
If you are upgrading from a single power supply to dual-redundant
power supplies for the first time, remove the power supply filler from
the switch’s front panel.
2.
Slide the new power supply unit into its slot until the unit is flush with
the front panel.
3.
Lock the metal handle into the power supply by pushing the handle up
and locking it into place.
4.
Reattach the power cord to the power supply.
5.
Turn on the power to the power supply. The Power-On Self-Test
(POST) automatically runs when the switch is powered up.
6.
Check for error messages through Telnet. The following figure shows
the Telnet error messages that are generated when a power supply is
turned off, removed, replaced, and turned back on. This is normal
operation.
(Old Power Supply turned off)
0x10fc1bb0 (tSwitch) : Mar 10 15:22:54
Error POWER-1_FAILED
(Old Power Supply removed)
0x10fc1bb0 (tSwitch) : Mar 10 15:23:08
Error POWER-OK, 4, Power OK
(New Power Supply installed)
0x10fc1bb0 (tSwitch) : Mar 10 15:23:16
Error POWER-1_FAILED, 1, Power Supply #1 failed
(New Power Supply turned on)
0x10fc1bb0 (tSwitch) : Mar 10 15:23:27
Error POWER-OK, 4, Power OK
Figure 3. Telnet traps generated when a power supply is replaced
Seitenansicht 9
1 2 ... 5 6 7 8 9 10 11

Kommentare zu diesen Handbüchern

Keine Kommentare